• Skip to main content
  • Skip to primary navigation
  • Contact
  • Give
  • Privacy
  • UC Berkeley
  • Accessibility
  • Nondiscrimination
Berkeley Engineering

CoE Sandbox

Educating leaders. Creating knowledge. Serving society.

  • About
    • Facts & figures
    • Rankings
    • Mission & values
    • Equity & inclusion
    • Voices of Berkeley Engineering
    • Leadership team
    • Milestones
    • Facilities
    • Maps
  • Admissions
    • Undergraduate admissions
    • Graduate admissions
    • New students
    • Visit
    • Maps
    • Admissions events
    • K-12 outreach
  • Academics
    • Undergraduate programs
    • Majors & minors
    • Undergraduate Guide
    • Graduate programs
    • Graduate Guide
    • Innovation & entrepreneurship
    • Kresge Engineering Library
    • International programs
    • Executive education
  • Students
    • New students
    • Advising & counseling
    • ESS programs
    • CAEE academic support
    • Student life
    • Wellness & inclusion
    • Undergraduate Guide
    • > Degree requirements
    • > Policies & procedures
    • Forms & petitions
    • Resources
  • Research & faculty
    • Centers & institutes
    • Undergrad research
    • Faculty
  • Connect
    • Alumni
    • Industry
    • Give
    • Stay in touch

California Memorial Stadium retrofit

A team of Berkeley Engineering faculty, working as part of the campus seismic review committee, advise on the retrofitting of Memorial Stadium, which sits directly astride the Hayward Fault.

The project took years of planning and cost more than $445 million for the stadium upgrades and an additional $153 million to build and integrate a new student-athlete center in the old stadium’s footprint. Today, the Sutardja Center for Entrepreneurship and Technology, as well as other academic programs, are located in the Memorial Stadium complex. California Memorial, designed by John Galen Howard and completed in 1923, sits atop the Hayward Fault, which is still seismically active. The redesigned stadium was put together in four modular parts. The upgrades include gigantic shock absorbers and massive concrete seismic blocks, which allow for the stadium to partially float over the fault, giving some measure of safety in the event of major seismic activity on game day.

< Back to previous page
  • Contact
  • Give
  • Privacy
  • UC Berkeley
  • Accessibility
  • Nondiscrimination
  • instagram
  • X logo
  • linkedin
  • facebook
  • youtube
© 2025 UC Regents